You need: the data you collected in the ramp activity of Collecting and Graphing Data That Can Be Modelled by a Quadratic (or the ramp data from that lesson: t = 0, 0.5, 1.0, 1.5, 2.0, 2.5 s and d = 0, 4, 15, 34, 61, 94 cm), graph paper, a calculator, and Desmos if you have a device.
- Plot the data and draw a curve of best fit.
- The ball starts from rest, so the vertex is (0, 0). Write d = at².
- Use a point far from the vertex to find a. Try two different points and compare.
- Use your model to predict the distance at a time you did not measure (interpolate), and at a time beyond your data (extrapolate). Which prediction do you trust more? Why?
- If you have Desmos, enter the data and find the quadratic regression. Compare a, b, c and R² with your model.
What to look for: with the sample data, (2, 61) gives a = 15.25 and (2.5, 94) gives a = 15.04, so d ≈ 15t². At t = 1.75 s this predicts about 46 cm. Extrapolating to t = 4 s predicts 240 cm, which only works if the ramp is at least 2.4 m long. A regression of the sample data gives a close to 15, with b and c close to 0.